Yes.Basic ideology behind the lean production system is Zero wastage ,
Zero defects and Zero breakdown .
The basic idea of lean concept is to sequence the
operation or production, in order to improving the productivity by reducing the
unnecessary, un reasonable, Non-Valve added activity (NVA) and to promote the
valve added (VA) activity
Generally there are Eight types of lean waste
Waste are generally categorized as Non-value added activity in any
organization. Lean primary focus it to attack the Non value added activity
first and reduce the Non value added activity through further improve &
eventually eliminate it completely. A process in general has around 95% Waste
in the form of Non value added activity.
Eight type of waste
Following are eight types of lean waste which are
Non-value added activity
Waste of Defects
Waste of Overproduction
Waste of Waiting
Waste of Non-utilized
talents
Waste of Transportation
Waste of Inventory
Waste of Motion
Waste of Extra Processing
Post a Comment